From: route@monster.com
Sent: Friday, August 19, 2016 10:52 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
James M. Terrell, PMP, MCTS (Project 2007)
105
Litton Lane, Cedar Creek, TX 78612512 217-8731 (C) Email:
jamesmterrell@Gmail.com512.303-3200 (H) Education:M.S., Physics; Specialty in Electro-Optics, Naval Postgraduate School
B.S., Electrical Engineering, University of Oklahoma Project Management Professional Certificate classes,
Villanova University Information Systems Technology coursework, Northern
Va. Community College Clearances:Previous– Final Secret (DoD)
Previously
Held – IRS Minimum Background Investigation, INS Minimum background
clearance, U.S. Postal Service cleared for sensitive information, DoD Top
Secret Certification:Project
Management Professional, Accepted as PMI Scheduling Professional Candidate, Microsoft
Certified Technology Specialist (Project 2007), IIL Orange
Belt for Microsoft Project 2003
Awards:2 Awards from the Boeing Company for my performance on the CH-47 MHLH
proposal. Letter of commendation for $6.5M procurement of composite
armor rapid development and deployment. Navy Achievement Medal for planning and
executing 144K hours of industrial work in 28 calendar days. Phi Theta Kappa,
Engineering (Tau Beta Pi), Electrical Engineering (Eta Kappa Nu) and Research
Honor Societies (Sigma Chi).
Software:Primavera Project Planner (P6 v8 [3+ years], P3e and P3 Desktop 8
years total) Sure Trak Project Manager (5 years), Microsoft Project (MS Project) (20+ years), Risk+ (4 years), Monte Carlo Risk
Analysis Software (3 years), Open Plan (2 years), Cobra (2 years), wInsight Earned Value Analysis Tool (1 year), MS Office Professional,
Visual Basic for Applications, Project Scheduler 7.
Experience Summary:
§
Project Management Professional (PMP)
§
Familiar with the DoD Planning Programming and
Budgeting System process.
§
Aerospace experience: Sierra Nevada Dream Chaser Space
Craft, Boeing 787, KC-46A Tanker, P-8A, V-22, H-47, F-35, CH-60, Global Hawk,
Gulfstream G5 aircraft including preparation, development, and management of
proposal schedules for delivery to the customer .
§
Littoral Combat Ship experience
§
Integrated Project Plan / Integrated Project Management
(IMP / IMS) Experience
§
Earned Value Management System (EVMS) experience
§
Prior military/government/defense experience including
the Federal
contracting environment.
§
Headquarters, R&D and Industrial experience managing
human and material resources, cost and schedule.
§
Microsoft SharePoint/Collaborative IDE. Data
Import/Export Understanding. Configuration Control Awareness. CDRL
Preparation and Submittal Awareness
§
Eight (8) years experience using Primavera
Project Planner (P6 v8 and P3 Desktop) including a
36,000 activity schedule. Maintained and controlled the WBS, activity codes
and user defined fields.
§
Recognized leader in MS Project. Planned, developed and maintained large, complex schedules and
resource monitoring tools. Integrated 57 project schedules to determine
program status (over 4000 activities).
§
Planned and completed 144K hours of production work in 28
calendar days during the Post Shakedown Availability (PSA) for the first AEGIS cruiser.
§
Six years experience developing, producing and employing STANDARD Missile. Developed modern warheads and dual thrust rocket
motors.
§
Proven performer with demonstrated attributes in
acquisition streamlining and tailoring.
Employment History:
General Dynamics Mission Systems, Contractor, Master
Planner/SchedulerMay 15 – May 16
Softworld,
Inc Westborough, MA §
Used Primavera P6 R8.3 and Microsoft Project 2010 created
and maintained the detailed resource loaded Integrated Master Schedule for
the Independence-variant Littoral Combat Ship (LCS).
§
Initiated and led implementation of the Reflections
feature of P6
§
Created and provide scheduling training for program
performance management staff and mentored PPM staff.
3M Corp, Contractor, Master SchedulerDec 14 – May 15
iSymmetry,
Alpharetta, GA §
Used Microsoft Project 2010 created and maintained the
detailed 9900 task, resource loaded master schedule for the Georgia SRTA toll
project.
Sierra Nevada Corp, Contractor, Planner/SchedulerMar 14 –
Sep 14
Johnson
Service Group, Ft Worth, TX §
Used Microsoft Project 2010 Created and maintained 6 IPT
project plans (Propulsion, Integrated Test, Crew, Thermal/Environmental
Control and Communications System and schedules for the Dream Chaser
Spacecraft proposal.
Triumph Aerostructures – Vought Aircraft Division
Contractor, PlannerDec 12 – Jan 14
Volt,
Ft Worth, TX §
Used Primavera (P6 R7) and Microsoft Project 2010 Created
and maintained project plans and schedules for the industrial move project of
the factory from Grand Prairie to Red Oak, Texas.
Lockheed Martin (LM) Contractor, PlannerJuly 12 – Dec 12
Global
Technical Services, Ft Worth, TX §
Used Microsoft Project 2003 Server and the EVMS Created
and maintained project plans and schedules for the Tri-National Medium
Extended Air Defense System (MEADS) program.
ConocoPhillips (CoP) Contractor, PlannerAug 11 – July 12
ISR
Infotech, LLC, Wilmington, DE §
Used P6 R7 and the EVMS Created and maintained project
plans, schedules and budgets for the CoP information technology (IT) projects
supporting petrochemical production, distribution and refining.
§
Used P6 v7 and EVMS to create and maintain information
technology projects supporting the spin-off of Phillips66 from
ConocoPhillips.
Boeing Contractor, Industrial EngineerMar 11 – Apr 11
Yoh
Aviation, St Louis, MO §
Created and maintained daily flight test, update and
maintenance schedules for the P-8 MMA using Visio.
Boeing Contractor, Integration SchedulerOct 10 – Feb 11
§ PDS
Technical, Inc, Seattle, WA §
Created team schedules for the Loads and Dynamics group
for the KC-46 Tanker Program
utilizing MS
Project and Open Plan Professional
Rockwell Collins, Inc Contractor, SchedulerFeb 10 – June
10
PDS
Technical, Inc, Irving, TX §
Created and maintained schedules for the E-6B Mercury
(TACAMO) Airborne Command Post for the US Navy
utilizing MS Project
§
Created the proposal schedule for the E-6B Block II
proposal utilizing MS Project
James M.
Terrell, PMP, continued
Boeing Contractor, Integration SchedulerFeb 08 – Jan 10
CSS
Technical Staffing, Newark, DE §
Created proposal schedules and maintained in-process
integration schedules for H-47 Chinook Global Support Services (GSS) for
several international programs utilizing MS Project and Open Plan
Professional
§
Created and maintained Integrated Master Schedule for the
V-22 Osprey GSS field support program utilizing MS Project and Open Plan
Professional
ERCOT Contractor, Integration Testing, Senior SchedulerApr
07– Jan 08
KForce,
Austin, TX §
Created and managed schedules for Nodal Integration
Testing Project utilizing MS Project.
§
Developed and maintained master schedule for implementing
integrated project plans for the Electric Reliability Council of Texas
(ERCOT), Energy Management Systems Project (EMS) and Market Management System
Project (MMS) utilizing MS Project.
District of Columbia Contractor, Master SchedulerOct 06 –
Apr 07
Compass
Solutions, LLC, Washington, DC §
Developed and maintained integrated master schedule for
implementing 10 project and the Project Management Office in the integrated
project plans format and EVMS for the Office of Chief Technology Officer
(OCTO) utilizing MS Project.
Boeing Contractor, Master SchedulerDec 05 – Aug 06
Foster
Design, Inc, Wichita, KS §
Developed and maintained IMP / IMS for implementing EVMS
for the Boeing 787, 777 cockpit utilizing MS Project and Primavera Project
Planner (P3e v4).
§
Setup, P3e enterprise codes, structure and individual
project Work Breakdown Structures for the 787 and 777 aircraft.
§
Imported schedules from Microsoft Project into P3e for
the 787 and 777 aircraft
§
Developed IMP / IMS for the US Department of Energy
Centrifuge Program utilizing MS Project.
§
Imported schedules from Microsoft Project to P3e for the
Centrifuge project
Texas A&M University Research Foundation Contractor,
Master SchedulerOct 05 – Dec 05
Scientific
Ocean Drilling Vessel (SODV) Conversion, Compliance
Software Technology, Inc, Lake Charles, LA §
Developed IMP and IMS for implementing EVMS for the SODV
Program Management Office utilizing MS Project.
BAE Systems, Austin, TXJan 05 – Jun 05
Manager,
Schedules – Integrated Defense Systems (IDS) §
Managed the schedules Department for the IDS Division
utilizing MS Project.
§
Implemented integrated master schedule techniques
utilizing MS Project.
Northrop Grumman Information TechnologyOct 00 – Jan 05
Planner
and Scheduler for Integrated Systems Contract (ISC) §
Maintained the master schedule CAP the Custodial
Accounting Project master schedule consisting of 57 individual government and
contractor schedules using MS Project (over 4000 activities).
§
Implemented integrated master schedules and performed
metric analysis using MS Project.
§
Managed and streamlined the ISC Internal Operations
Master schedules using MS Project.
§
Determined Tools suite for IRS customer program
management office start-up.
§
Staffing resource coordinator for program management
tools expertise.
James M.
Terrell, PMP, continued
Raytheon, Lockheed Martin and Hughes Contractor Jan 00 –
Oct 00
Steven
Meyers and Associates,Engineer and Proposal Planner §
Raytheon:Created and maintained Integrated Master Plan
(IMP) and Integrated Master Schedules (IMS) for the National Missile Defense
program proposal using MS Project.
§
Lockheed Martin:Logistics planning and scheduling for the
F-35 Joint Strike Fighter proposal using MS Project.
§
Hughes:Planning and integration for a satellite launch
utilizing the Sea Launch platform using MS Project.
Science Applications International Corporation (SAIC)Jun
98 to Jan 00
Program
Control Manager §
Developed and maintained resource loaded networks using
MS Project and Primavera Project Planner (P3).
§
Implemented Earned Value cost and schedule reporting
policies and methodologies.
§
Forecasted financial and schedule performance including
establishing and maintaining cost/schedule baseline and estimates at
completion.
§
Performed quantitative cost and schedule risk assessments
and Critical Path analyses using MS Project.
FAA and US Postal Service Contractor May 95 to Jun 98
Engineer
and Process Improvement Specialist CEXEC,
Inc. §
Created and maintained a 36,000 activity schedule using
Primavera Project Planner (Desktop).
§
Using P3 (Desktop), created and maintained a resource
loaded 13,000 activity schedule to monitor the resource planning and
utilization of critical resources for the Air Traffic Control System
modernization
§
Created scripts to import installation and implementation
completion data from MS Access into P3 desktop
§
Conducted detailed cost, schedule and risk analysis of
prime contractor and government performance using Primavera Project Planner
Monte Carlo software.
§
Scheduled lifecycle upgrades for hardware and software
for ATC using MS Project and P3 (Desktop).
IRS Contractor, Lead Planner and SchedulerFeb 94 to May 95
Midwest
Technical, Inc §
Introduced, developed, implemented and maintained the
schedule for the IRS Tax Modernization System.
§
Integrated 46 schedules for the IRS Tax Modernization
System MS Project (over 4000 activities).
University Research AssociatesMar 91 to Jan 94
Product
Manager/Lab Furnished Equipment Coordinator §
Delivered ahead of schedule, on budget and tested the
largest superconducting magnets ever produced for the DOE mandated String
Test using MS Project.
§
Led the design, development effort for quadrupole
superconducting magnets for the High Energy Booster (HEB).
§
Evaluated HEB quadrupole magnet production tooling for
full rate production requirements using MS Project and MS Excel.
§
Delivered on schedule, $1B worth of GFE to SSCL
contractors using MS Project and MS Excel.
James M.
Terrell, PMP, continued
United States NavyJuly 75 to Feb 91
Lt. Commander, Surface Line
Officer, Engineering Duty Officer, Acquisition Specialist §
Completed 144K hours of production work in 28 calendar
days during the Post Shakedown Availability (PSA) for USS TICONDEROGA, the
first AEGIS cruiser. Planned the PSA in five months.
§
Developed and delivered state of the art warheads and
rocket motors for the U.S. Navy’s STANDARD missile.
§
DOD Acquisition Specialist on the staff of the Assistant
Secretary of the Navy.
§
$6.5M procurement of composite armor rapid development
and deployment.
§
Led the planning, procurement, installation, integration
and testing of four new construction guided missile destroyers’ combat
systems and the overhaul of nine destroyers.
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|